March Business Meeting – Thursday 12th March

Reminder of our bi-monthly Business Meeting this Thursday. All members welcome. The agenda is largely around what we are going to do with the facility now we are up and running. Some of them are old ideas, some new.

Non-members interested are also welcome, i.e. anyone interested in joining or other non-members. (Only members can vote).

The meeting is at:

Banchory Men’s Shed new premises

beneath the British Legion Scotland

Ramsay Road, Banchory

Thursday  12th March at 2:00 p.m.

Chairs ready for the meeting...

Chairs ready for the meeting…


Mission Impossible Possible

After nearly 5 years, since 16th April 2015, we finally have proper premises for the Banchory Men’s Shed.  It was all going to be so easy, but more on that another time.

Completion of the build on 7th February left us with a social area echoing to the sound of a concrete floor, but only 2 weeks later, on Monday 24th February, we had ourselves a carpet too, with walls all painted between-times by a bunch of Shedders.

We can now set about laying out the Workshop room as a workshop rather than for rather cramped dual purposes, and can look at what we need in the social area too. Whilst opening times will remain for the moment at 10:30-12:00 every Tuesday, it may not be long before we start opening up at other times.

A big event on the horizon is an Official Opening which will be on

Tuesday 19th May 2020 at 10:30 a.m.

Full details in due course.

At this point we would like to thank again everyone involved in bringing our Shed to fruition, with key external parties being Gerry and Adam Robb of Gerry Robb Architectural Services, Bruce McCombie and his crew, Duncans of Banchory, and of course Craig, Alastair and co. in the Banchory Legion, not forgetting Susie for the refreshments which kept us going!  Too many thanks to list Shed members, but you know who you are.

Our membership has been growing steadily since we opened the Phase 1 Workshop and now we have full premises we expect further growth.

In financial terms, we managed to bring in the Banchory Men’s Shed for a total of around £76,000 all-in (Phases 1 and 2), compared to a first estimate back in 2015 of upwards of £120,000 plus the VAT.  This is a creditable performance by all concerned.  Nevertheless, we did run into some issues, notably finding a granite formation protruding into where the floor needed to be, needing some significant rock-breaking by Bruce’s team, and hence we went over even our budget contingency.  We have consumed all grant monies and our bank reserves and are now of the order of £2,000 short once all invoices are in.  If you would like to help, please see our Funding page.  Many thanks.

7th February update

The Banchory Men’s Shed is built.

The final building work was complete at the beginning of this week and the final items, being the fire detectors and hook-ups to the Legion’s fire detection and alarm system, were complete on Thursday.

On the Tuesday, our high-tech sink, water heater, and even more high-tech combined sink plug / strainer / overflow were figured out, risk-assessed and commissioned by our resident ex-Drilling Engineer, who shall remain nameless, under the watchful eye of our resident ex-Process Engineer, who shall also remain nameless.

Proof…

All was successful and Tuesday’s cups were duly washed up – in hot water! – luxury – and left to dry. Some problems were however encountered with commissioning the new-fangled tea-towel technology, which, not having been washed beforehand simply shed fluff all over the carefully-washed up mugs.

Having been finally emptied just before, on Friday the blue shipping container was finally taken away by a happy Fife farmer, prior to the expiry of its temporary planning permission.

So the Shed is almost ready for occupation – we just need to get final certification and to notify Aberdeenshire Council.

Thanks to everyone.

On Monday we will start painting the ceiling and walls, please come along and help – the premises will be opened starting 9:00 a.m.

31st Jan 2020 – Tunnel, Lights, Action

Very little left to do now, basically the fire alarm hookup (Thursday) and painting.

In this last couple of weeks we’ve seen the Ames Taping, Electrician Second Fix and Plumber Second Fix all complete.

  • Only final finishing required

Progress at 14th Jan 2020 / Meeting 16th Jan reminder

A new year has arrived, the Builders are back at work after the seasonal break and the end is very nearly in sight.

  • Right hand side, door to Legion / Loos at back right corner

Progress since last report is:

  • The Electrician has completed the main wing runs and installed the fire alarm cable
  • The Joiner has installed most of the plaster board
  • The 3 door frames are ready for the new doors
  • The Joiner has re-positioned the Fire Exit doors from the Legion in the rear corridor
  • The step and platform within the room to the back exit door (to the back corridor) are complete

Total progress to the project plan is about 82%

Can we also remind folk that the bi-monthly meeting is THIS THURSDAY, 16th Jan at 10:00 a.m. (not the usual afternoon meeting), upstairs in the Legion.  Many thanks